Fatou station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Intersection of Fatou Road (垡头路) and Fatou East Street (垡头东街) Chaoyang District, Beijing China | ||||||||||
Coordinates | 39°51′51″N 116°30′50″E / 39.864082°N 116.513817°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Fatou station (simplified Chinese: 垡头站; traditional Chinese: 垡頭站; pinyin: Fátóu Zhàn) is a station on Line 7 of the Beijing Subway. It was opened on December 30, 2018.[1]
The adjacent stations are Happy Valley to the northwest and Shuanghe to the east.
The station is located in Chaoyang District,[2] at the intersection of Fatou Road (垡头路) and Fatou East Street (垡头东街).
History
[edit]The station's platforms were completed on 28 December 2014, along with the rest of the initial section of Line 7, but, due to the need to clear space at the surface for station entrances, the station has remained unopened and trains pass through without stopping at Fatou.[3] In November 2017, the Beijing Municipal Commission of Housing and Urban Rural Development, and the Beijing Daily, both stated they expected the station to be operational by the end of 2018.[4][5] It was opened on December 30, 2018.[6]
Station layout
[edit]The station has an underground island platform.
Exits
[edit]There are 02 exits, lettered A and C. Exit C is accessible.
References
[edit]- ^ http://news.ynet.com/2018/12/30/1600990t70.html[permanent dead link ]
- ^ 北京市规划委员会关于轨道交通7号线沿线车站站名命名预案的公示书 (in Chinese). Beijing Municipal Planning Committee (北京市规划委员会). 29 August 2013. Archived from the original on 23 September 2015. Retrieved 15 October 2013.
- ^ Zheng Yujia (郑羽佳); Huang Hailei (黄海蕾) (16 May 2014). 地铁垡头站因拆迁问题将甩站. Beijing Times. Archived from the original on 9 May 2015. Retrieved 15 June 2014.
- ^ 7号线垡头站明年有望启用. bjrb.bjd.com.cn (in Chinese). 14 November 2017.
- ^ 北京向东看 (12 November 2017). 北京地铁7号线垡头站动工!预计2018年年底通车 (in Chinese). 163.com. Retrieved 29 June 2018.
- ^ http://news.ynet.com/2018/12/30/1600990t70.html[permanent dead link ]
External links
[edit]