Slieve Rushen Wind Farm
Appearance
The topic of this article may not meet Wikipedia's notability guideline for geographic features. (January 2022) |
Slieve Rushen Wind Farm | |
---|---|
Country | Northern Ireland, United Kingdom |
Location | County Fermanagh |
Coordinates | 54°09′36″N 07°37′12″W / 54.16000°N 7.62000°W |
Status | Operational |
Construction began | July 2007 |
Commission date | April 2008 |
Construction cost | £900,000 |
Operator | B9 Energy |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 18 X 3 MW |
Make and model | Vestas: V90 |
Nameplate capacity | 54 MW |
Annual net output | 135 GWh |
Slieve Rushen Wind Farm is an 18-turbine wind farm in County Fermanagh, Northern Ireland, with a total capacity of 54 MW, enough to power over 30,000 homes.[1] It was commissioned in April 2008.[1]
See also
[edit]References
[edit]- ^ a b UK Operational Wind Farms – Renewable UK Archived 2011-10-01 at the Wayback Machine Accessed 5 October 2011